Article successfully added.

Post Filippine

  • 20.1401.038.20
  • € 96.25

    Prices plus VAT plus shipping costs

    Delivery time 14 Workdays

    Execution

    Ø Diameter

    Surface

    • 370 mm
    No sets available for the selected variant.
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.038.20
    End ball Loranna
    11.0212.038.20
    Tube connector Berb
    11.0500.038.20
    Tube, cutted Emma
    12.8900.038.12
    Glass clamp Amarentia
    10.2708.038.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.038.21
    End ball Loranna
    11.0212.038.21
    Tube connector Berb
    11.0500.038.21
    Tube, cutted Emma
    11.8900.038.21
    Glass clamp Amarentia
    10.2708.038.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.038.22
    End ball Loranna
    11.0212.038.22
    Tube connector Berb
    11.0500.038.22
    Tube, cutted Emma
    11.8900.038.22
    Glass clamp Amarentia
    10.2708.038.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.038.23
    End ball Loranna
    11.0212.038.23
    Tube connector Berb
    11.0500.038.23
    Tube, cutted Emma
    12.8900.038.10
    Glass clamp Amarentia
    10.2708.038.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.038.26
    End ball Loranna
    11.0212.038.26
    Tube connector Berb
    11.0500.038.26
    Tube, cutted Emma
    11.8900.038.26
    Glass clamp Amarentia
    10.2708.038.26
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.025.20
    End ball Loranna
    11.0212.025.20
    Tube connector Berb
    11.0500.025.20
    Tube, cutted Emma
    12.8900.025.12
    Glass clamp Amarentia
    10.2708.025.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.025.21
    End ball Loranna
    11.0212.025.21
    Tube connector Berb
    11.0500.025.21
    Tube, cutted Emma
    11.8900.025.21
    Glass clamp Amarentia
    10.2708.025.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.025.22
    End ball Loranna
    11.0212.025.22
    Tube connector Berb
    11.0500.025.22
    Tube, cutted Emma
    11.8900.025.22
    Glass clamp Amarentia
    10.2708.025.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1401.025.23
    End ball Loranna
    11.0212.025.23
    Tube connector Berb
    11.0500.025.23
    Tube, cutted Emma
    12.8900.025.10
    Glass clamp Amarentia
    10.2708.025.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.038.20
    End ball Loranna
    11.0212.038.20
    Tube connector Berb
    11.0500.038.20
    Tube, cutted Emma
    12.8900.038.12
    Glass clamp Amarentia
    10.2708.038.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.038.21
    End ball Loranna
    11.0212.038.21
    Tube connector Berb
    11.0500.038.21
    Tube, cutted Emma
    11.8900.038.21
    Glass clamp Amarentia
    10.2708.038.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.038.22
    End ball Loranna
    11.0212.038.22
    Tube connector Berb
    11.0500.038.22
    Tube, cutted Emma
    11.8900.038.22
    Glass clamp Amarentia
    10.2708.038.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.038.23
    End ball Loranna
    11.0212.038.23
    Tube connector Berb
    11.0500.038.23
    Tube, cutted Emma
    12.8900.038.10
    Glass clamp Amarentia
    10.2708.038.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.038.26
    End ball Loranna
    11.0212.038.26
    Tube connector Berb
    11.0500.038.26
    Tube, cutted Emma
    11.8900.038.26
    Glass clamp Amarentia
    10.2708.038.26
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.025.20
    End ball Loranna
    11.0212.025.20
    Tube connector Berb
    11.0500.025.20
    Tube, cutted Emma
    12.8900.025.12
    Glass clamp Amarentia
    10.2708.025.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.025.21
    End ball Loranna
    11.0212.025.21
    Tube connector Berb
    11.0500.025.21
    Tube, cutted Emma
    11.8900.025.21
    Glass clamp Amarentia
    10.2708.025.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.025.22
    End ball Loranna
    11.0212.025.22
    Tube connector Berb
    11.0500.025.22
    Tube, cutted Emma
    11.8900.025.22
    Glass clamp Amarentia
    10.2708.025.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1403.025.23
    End ball Loranna
    11.0212.025.23
    Tube connector Berb
    11.0500.025.23
    Tube, cutted Emma
    12.8900.025.10
    Glass clamp Amarentia
    10.2708.025.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.038.20
    End ball Loranna
    11.0212.038.20
    Tube connector Berb
    11.0500.038.20
    Tube, cutted Emma
    12.8900.038.12
    Glass clamp Amarentia
    10.2708.038.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.038.21
    End ball Loranna
    11.0212.038.21
    Tube connector Berb
    11.0500.038.21
    Tube, cutted Emma
    11.8900.038.21
    Glass clamp Amarentia
    10.2708.038.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.038.22
    End ball Loranna
    11.0212.038.22
    Tube connector Berb
    11.0500.038.22
    Tube, cutted Emma
    11.8900.038.22
    Glass clamp Amarentia
    10.2708.038.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.038.23
    End ball Loranna
    11.0212.038.23
    Tube connector Berb
    11.0500.038.23
    Tube, cutted Emma
    12.8900.038.10
    Glass clamp Amarentia
    10.2708.038.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.038.26
    End ball Loranna
    11.0212.038.26
    Tube connector Berb
    11.0500.038.26
    Tube, cutted Emma
    11.8900.038.26
    Glass clamp Amarentia
    10.2708.038.26
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.025.20
    End ball Loranna
    11.0212.025.20
    Tube connector Berb
    11.0500.025.20
    Tube, cutted Emma
    12.8900.025.12
    Glass clamp Amarentia
    10.2708.025.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.025.21
    End ball Loranna
    11.0212.025.21
    Tube connector Berb
    11.0500.025.21
    Tube, cutted Emma
    11.8900.025.21
    Glass clamp Amarentia
    10.2708.025.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.025.22
    End ball Loranna
    11.0212.025.22
    Tube connector Berb
    11.0500.025.22
    Tube, cutted Emma
    11.8900.025.22
    Glass clamp Amarentia
    10.2708.025.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1402.025.23
    End ball Loranna
    11.0212.025.23
    Tube connector Berb
    11.0500.025.23
    Tube, cutted Emma
    12.8900.025.10
    Glass clamp Amarentia
    10.2708.025.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.038.20
    End ball Loranna
    11.0212.038.20
    Tube connector Berb
    11.0500.038.20
    Tube, cutted Emma
    12.8900.038.12
    Glass clamp Amarentia
    10.2708.038.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.038.21
    End ball Loranna
    11.0212.038.21
    Tube connector Berb
    11.0500.038.21
    Tube, cutted Emma
    11.8900.038.21
    Glass clamp Amarentia
    10.2708.038.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.038.22
    End ball Loranna
    11.0212.038.22
    Tube connector Berb
    11.0500.038.22
    Tube, cutted Emma
    11.8900.038.22
    Glass clamp Amarentia
    10.2708.038.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.038.23
    End ball Loranna
    11.0212.038.23
    Tube connector Berb
    11.0500.038.23
    Tube, cutted Emma
    12.8900.038.10
    Glass clamp Amarentia
    10.2708.038.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.038.26
    End ball Loranna
    11.0212.038.26
    Tube connector Berb
    11.0500.038.26
    Tube, cutted Emma
    11.8900.038.26
    Glass clamp Amarentia
    10.2708.038.26
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.025.20
    End ball Loranna
    11.0212.025.20
    Tube connector Berb
    11.0500.025.20
    Tube, cutted Emma
    12.8900.025.12
    Glass clamp Amarentia
    10.2708.025.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.025.21
    End ball Loranna
    11.0212.025.21
    Tube connector Berb
    11.0500.025.21
    Tube, cutted Emma
    11.8900.025.21
    Glass clamp Amarentia
    10.2708.025.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.025.22
    End ball Loranna
    11.0212.025.22
    Tube connector Berb
    11.0500.025.22
    Tube, cutted Emma
    11.8900.025.22
    Glass clamp Amarentia
    10.2708.025.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1405.025.23
    End ball Loranna
    11.0212.025.23
    Tube connector Berb
    11.0500.025.23
    Tube, cutted Emma
    12.8900.025.10
    Glass clamp Amarentia
    10.2708.025.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.038.20
    End ball Loranna
    11.0212.038.20
    Tube connector Berb
    11.0500.038.20
    Tube, cutted Emma
    12.8900.038.12
    Glass clamp Amarentia
    10.2708.038.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.038.21
    End ball Loranna
    11.0212.038.21
    Tube connector Berb
    11.0500.038.21
    Tube, cutted Emma
    11.8900.038.21
    Glass clamp Amarentia
    10.2708.038.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.038.22
    End ball Loranna
    11.0212.038.22
    Tube connector Berb
    11.0500.038.22
    Tube, cutted Emma
    11.8900.038.22
    Glass clamp Amarentia
    10.2708.038.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.038.23
    End ball Loranna
    11.0212.038.23
    Tube connector Berb
    11.0500.038.23
    Tube, cutted Emma
    12.8900.038.10
    Glass clamp Amarentia
    10.2708.038.23
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.038.26
    End ball Loranna
    11.0212.038.26
    Tube connector Berb
    11.0500.038.26
    Tube, cutted Emma
    11.8900.038.26
    Glass clamp Amarentia
    10.2708.038.26
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.025.20
    End ball Loranna
    11.0212.025.20
    Tube connector Berb
    11.0500.025.20
    Tube, cutted Emma
    12.8900.025.12
    Glass clamp Amarentia
    10.2708.025.20
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.025.21
    End ball Loranna
    11.0212.025.21
    Tube connector Berb
    11.0500.025.21
    Tube, cutted Emma
    11.8900.025.21
    Glass clamp Amarentia
    10.2708.025.21
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.025.22
    End ball Loranna
    11.0212.025.22
    Tube connector Berb
    11.0500.025.22
    Tube, cutted Emma
    11.8900.025.22
    Glass clamp Amarentia
    10.2708.025.22
    The set includes:
    Open set
    An error occurred while saving the bundle configuration.
    Post Filippine
    20.1404.025.23
    End ball Loranna
    11.0212.025.23
    Tube connector Berb
    11.0500.025.23
    Tube, cutted Emma
    12.8900.025.10
    Glass clamp Amarentia
    10.2708.025.23
    standard for 8 mm glass more
    Product information "Post Filippine"

    standard for 8 mm glass

    Show more Variants
     
    Order number Picture Variant Price Quantity
    20.1401.025.20
    Post Filippine
    Execution: Left end post
    Ø Diameter: 25,4 mm (1")
    Surface: Stainless steel design
    € 82.70

    Delivery time 14 Workdays

    € 82.70
    20.1401.025.21
    Post Filippine
    Execution: Left end post
    Ø Diameter: 25,4 mm (1")
    Surface: Matt brass design
    € 130.70

    Delivery time 14 Workdays

    € 130.70
    20.1401.025.22
    Post Filippine
    Execution: Left end post
    Ø Diameter: 25,4 mm (1")
    Surface: Brass design
    € 88.30

    Delivery time 14 Workdays

    € 88.30
    20.1401.025.23
    Post Filippine
    Execution: Left end post
    Ø Diameter: 25,4 mm (1")
    Surface: Chrome design
    € 85.75

    Delivery time 14 Workdays

    € 85.75
    20.1401.038.20
    Post Filippine
    Execution: Left end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Stainless steel design
    € 96.25

    Delivery time 14 Workdays

    € 96.25
    20.1401.038.21
    Post Filippine
    Execution: Left end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Matt brass design
    € 151.35

    Delivery time 14 Workdays

    € 151.35
    20.1401.038.22
    Post Filippine
    Execution: Left end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Brass design
    € 105.80

    Delivery time 14 Workdays

    € 105.80
    20.1401.038.23
    Post Filippine
    Execution: Left end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Chrome design
    € 100.05

    Delivery time 14 Workdays

    € 100.05
    20.1401.038.26
    Post Filippine
    Execution: Left end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Anthracite black design
    € 114.60

    Delivery time 14 Workdays

    € 114.60
    20.1403.038.20
    Post Filippine
    Execution: Right end post
    Ø Diameter: 38,1 mm (1,5")
    Surface: Stainless steel design
    € 96.25

    Delivery time 14 Workdays

    € 96.25
    BUNDLE
    Post, Stainless steel design, 20.150x.xxx.xx Post Alberte
    From € 72.50
    BUNDLE
    Post, Stainless steel design, Left end post, 20.171x.025.xx Post Caro-Lynn
    From € 98.25
    BUNDLE
    Post, Stainless steel design, 20.190x.038.xx Post Sherran
    From € 111.00
    BUNDLE
    Post, 20.195x.035.20 Post Elfie
    € 124.75
    BUNDLE
    Post, Left end post, 20.8451.038.20 Post Kamani
    From € 155.80
    BUNDLE
    Post, 20.123x.035.20 Post Milka
    From € 236.25
    BUNDLE
    Post, 20.122x.xxx.20 Post Miryanne
    From € 232.55
    BUNDLE
    Post, 20.162x.xxx.20 Post Arjeta
    From € 80.55
    BUNDLE
    Post, Stainless steel design, 20.130x.xxx.xx Post Bregje
    From € 141.00
    BUNDLE
    Post, Stainless steel design, 20.151x.xxx.xx Post Danytsia
    From € 72.50
    BUNDLE
    Post, Stainless steel design, 20.121x.xxx.xx Post Estelie
    From € 154.95
    BUNDLE
    Post, Stainless steel design, 20.120x.xxx.xx Post Brenna
    From € 156.55
    BUNDLE
    Post, Stainless steel design, 20.161x.xxx.xx Post Malika
    From € 76.85
    BUNDLE
    Post, Stainless steel design, 20.112x.xxx.xx Post Annelotte
    From € 133.65
    BUNDLE
    Post, Stainless steel design, 20.160x.xxx.xx Post Leann
    From € 72.50
    Tube, cutted, Stainless steel design, xx.0900.0xx.xx Tube, cutted Emma
    From € 14.85
    Viewed
    • Purchase on invoice
    • Fast shipping
    • Competent advice
    • Free Shipping
    • for DE, AT, NL & BE